Mariner Statoil – UK

Project: Mariner Statoil – UK
Project type: Product Delivery
Period: 2013 – 2015


SoW: Safety critical products

ALIGN Fire Protection Engineering AS (FPE) was in October 2013 awarded a frame agreement from Daewoo Shipbuilding and Marine Engineering (DSME) for delivery of fire technical equipment to Statoil’s Mariner Topside project.

The frame agreement for firefighting:

  • Mariner topside
  • Two Floating Storage Units
  • A jack-up drilling rig
  • Options for future Statoil field devolpments in UKCS

Through the project we worked close with construction site DSME as well as the engineerings partners CB&I and RDS.

ALIGN FPE delivery included:

  • Deluge Systems
  • Active Hydrophore System
  • Water Mist Systems
  • Sprinkler Systems
  • Firewater Hydrants
  • Firewater Monitors

Pump products from ALIGN Eureka:

  • 1 x Essential Generator Package 5.2 MWe
  • Eureka took on the challenge to propose solutions for containerised EDG and EsDG with enclosure
  • Both packages to meet maximum noise level 85 dB(A) @ 1 metre
  • The container and enclosure rated H60
  • Both Gen Set packages are very large and complex. EDG has forced air cooling system. EsDG is an enclosure with no base and s.w. cooled
  • EDG is 13m x 6.65m x 4.17m (LxWxH) and total weight 84,980 KG dry
  • EsDG is 13m x 6.4m x 6.3m and total weight 129,225 KG dry